
Sungrow EV Charger (Three Phase)
The pick if you have, or plan to add, solar. Charges from your excess solar so daytime charging can cost next to nothing. Smart app control and scheduling.
Fixed install price shown online after a few quick questions about your switchboard and cable run.
What the price covers
- →The Sungrow charger, three phase, up to 22kW
- →Installation by a licensed Queensland electrician on its own dedicated, RCD-protected circuit
- →The first 5 metres of cable run from the switchboard to the charger
- →Mounting, commissioning and setting up the charger's app
- →Testing and the Queensland electrical certificate on completion
Covers a standard install. If anything non-standard turns up on site (switchboard upgrade, three phase not present, an unusually long or difficult run) we quote that separately before doing it, and it is refundable if you would rather not proceed.
About this install
Sungrow EV Charger (Three Phase), supplied and installed by Nuvolt, a licensed Queensland electrical contractor, across the Sunshine Coast and Brisbane's northside. Installation is included: a dedicated, RCD-protected circuit, the first 5 metres of cable run from the switchboard, mounting, commissioning and the electrical certificate. Three phase charging, up to 22kW. The pick if you have, or plan to add, solar. Charges from your excess solar so daytime charging can cost next to nothing. Smart app control and scheduling. Covers a standard install; anything non-standard found on site is quoted separately before any work is done.
Already own a charger, or want a brand we do not stock? We install any EV charger on its own compliant circuit. See EV charger installation for how that works, or read what drives the cost of a home EV charger install.
